Menu:

News - October 2013


30.10.2013 - Testbed operational
After the move to Graz the RELYonIT testbed has been installed at the new location and is operational again.

Installation of the new testbed infrastructure.
LO Node heating a wireless sensor node.
Installed testbed infrastructure.